Completed Projects | ITECO Nepal
ITECO Nepal (P) Ltd.

Completed Projects

A modern portfolio of completed engineering, infrastructure, hydropower, transportation, water-resource and urban development assignments.

55 projects shownEngineering & infrastructure portfolio
1
Hydropower

GMR Upper Karnali Hydropower

Client: RRRSDP

Start —Completed 2011-02-22
2
Transportation

Permanent Steel Arch Bridge over Karnali River for Upper Karnali Hydroelectric Project (Total 200m span)

Client: GMR Upper Karnali Hydropower

Start —Completed 2010-11-19
3
Transportation

Detailed Survey, Soil Investigation and Detailed Engineering Design of Bridges

Client: DRILP/CISC/DRSP

Start —Completed 2010-06-11
4
Transportation

Road Sector Development Project (RSDP-2), Feasibility and Detail Design Phase

Client: Road Sector Development Project

Start 2010-02-11Completed 2011-04-12
5
Transportation

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Analysis & Detailed Design of Bridges

Client: Bridge Project, DoR

Start —Completed 2010-04-01
6
Transportation

Detailed Engineering Survey, Soil Investigation and Detailed Design of Permanent Bridge over Seti River

Client: NEA

Start —Completed 2010-04-06
7
Transportation

Road Upgrading Works — 100 km under Road Improvement Project (Package C)

Client: Department of Roads.

Start —Completed 2009-12-28
8
Transportation

Bishnumati Link Road Upgrading Sub-Project (2.7 km), 4-lane Road

Client: Kathmandu Metropolitan City / UEIP / ADB

Start —Completed 2010-04-22
9
Transportation

Bhutan Farm Roads Projects — 6 Roads, Total 56 KM

Client: Hill Road Bhutan

Start —Completed 2008-12-24
10
Transportation

RCC Multiple Cell Box Bridge and RCC T-Girder Bridge Design

Client: DoLIDAR / Trail Bridge

Start 2007-01-10Completed 2007-07-26
11
Transportation

Road Users Satisfaction Survey (RUSS) — 40 Locations within Nepal

Client: Road Board Nepal

Start 2006-08-27Completed 2007-01-01
12
Transportation

Rural Access Improvement and Decentralization Project (RAIDP)

Client: WB / DoLIDAR

Start 2005-08-20Completed 2010-05-25
13
Transportation

North-South Fast Track Project — Kathmandu–Janakpur–Nijgadh and Hetauda Bypass

Client: ADB / DoR

Start 2007-03-12Completed 2008-04-22
14
Transportation

Institutional Strengthening Component under Road Maintenance and Development Project

Client: DOR / Kathmandu

Start 2000-12-02Completed 2006-08-22
15
Transportation

Strengthening Project Implementation Practices Project

Client: HMG / Asian Development Bank

Start —Completed 2007-03-02
16
Transportation

Development of Technical Audit Capacity of Chief Examiner Section

Client: MOPPW / RMDP / DOR / HMGN / IDA

Start —Completed 2003-07-29
17
Transportation

Road Maintenance and Development Project — Rehabilitation Component

Client: DoR / HMG / IDA

Start —Completed 1999-06-22
18
Transportation

Annual Surface Distress & Road Roughness Survey on Strategic Road Network

Client: DOR / HMG

Start —Completed 1997-07-25
19
Transportation

Tribhuvan Highway Rehabilitation Project, Makawanpur

Client: DOR / KfW

Start —Completed 1994-12-26
20
Transportation

Prithvi Highway Rehabilitation Project, Dhading

Client: Scott Wilson Kirkpatrick

Start —Completed 1994-07-10
21
Environment

Environmental Measures Implementation Plan, Bhutan — Phase II

Client: FAO, Rome

Start —Completed 1993-09-01
22
Transportation

Road Sector Development Project (RSDP-2), Construction Supervision Phase

Client: DoR / WB

Start —Completed 2011-06-12
23
Transportation

Arniko Highway Rehabilitation, Sindhupalchowk

Client: HMG / DOR

Start —Completed 1993-12-02
24
Transportation

Transport Connectivity Sector Project — Candidate Feeder Roads

Client: DoR / ADB

Start —Completed 2005-06-25
25
Transportation

Piluwa Khola Bridge (96m span) — Design & Construction Supervision

Client: DoR / ADB

Start —Completed 2009-12-14
26
Transportation

Malekhu–Dhadingbesi Road, Dhading

Client: DOR / KfW

Start —Completed 1996-07-14
27
Transportation

Charnawati Rehabilitation Project (Phase I), Sindhupalchowk

Client: SDC

Start —Completed 1988-09-12
28
Hydropower

Likhu IV Hydroelectric Access Road (45 km) with RCC Bridges

Client: Green Venture (P) Ltd.

Start —Completed 2008-04-22
29
Transportation

Bhainse–Hetauda Road & Bridge Project — Feasibility, Design & Supervision

Client: KfW, Germany

Start —Completed 1998-03-12
30
Hydropower

Thulo Dhunga Medium Hydropower Project (24.7 MW)

Client: SDC, Nepal

Start —Completed 1996-07-09
31
Environment

Strategic Environment Assessment of National Water Plan

Client: WECS / Ministry of Water Resources

Start —Completed 2003-07-27
32
Hydropower

Basic Study for Rural Electrification through Small Hydropower Development

Client: JICA

Start —Completed 2003-02-25
33
Hydropower

Screening & Ranking of 25 Small Hydropower Projects (5–10 MW)

Client: Department of Electricity Development

Start —Completed 2002-02-03
34
Hydropower

Pancheshwar Multipurpose Project

Client: Nepal–India Joint Project Office

Start —Completed 2002-06-27
35
Hydropower

Lapchi Hydropower Project (160 MW) — DPR & EIA

Client: NASA Hydropower P. Ltd

Start 2010-10-11Completed 2011-09-12
36
Hydropower

Likhu-2 Hydroelectric Project (55 MW) — DPR & EIA

Client: Global Hydropower Associate P. Ltd

Start 2009-01-25Completed 2010-07-31
37
Hydropower

Likhu-1 Hydroelectric Project (77 MW) — DPR & EIA

Client: Pan Himalayan Energy P. Ltd

Start 2009-01-10Completed 2010-07-22
38
Hydropower

Likhu A Hydroelectric Project (51 MW) — DPR & EIA

Client: Numbur Himalaya Hydropower P. Ltd

Start 2009-01-03Completed 2010-07-10
39
Hydropower

Likhu-IV Hydropower Project (120 MW) — DPR

Client: Green Venture (P) Ltd.

Start 2007-06-12Completed 2008-06-03
40
Water & Irrigation

Second Small Towns Water Supply & Sanitation Sector Project

Client: DWSS / ADB

Start 2010-04-01Completed 2014-04-03
41
Water & Irrigation

Construction of Headworks of Sikta Irrigation Project (34,000 ha)

Client: DoI

Start 2006-07-02Completed 2011-01-27
42
Water & Irrigation

Kathmandu Water Supply Facilities — Basic Design Study

Client: JICA

Start —Completed 2000-12-10
43
Water & Irrigation

Pithuwa Water Supply Project — Treatment Plant & Distribution Network

Client: DWSS / Chitwan

Start —Completed 1996-06-02
44
Water & Irrigation

Birendranagar Water Supply Project — Treatment Plant

Client: HMG / DWSS

Start —Completed 1995-09-06
45
Water & Irrigation

Tawa Khola Irrigation Sub-Project — Detailed Feasibility Study

Client: HMG / DOI / DIO Udayapur

Start —Completed 1995-08-22
46
Urban Infrastructure

Bishnumati Link Road Upgrading Sub-Project

Client: Kathmandu Metropolitan City

Start —Completed 2010-04-12
47
Urban Infrastructure

Drainage & Sewerage Projects in Sindhuli / Bhaktapur / Ramechhap Towns

Client: DWSS / HMG Nepal

Start —Completed 2004-08-02
48
Urban Infrastructure

Kamerotar Land Pooling Project, Madhyapur Municipality

Client: Ministry of Physical Planning & Works / KV Town Development Committee

Start —Completed 2003-12-10
49
Urban Infrastructure

Dhobi Khola Corridor Improvement Project — Package 1

Client: KV Mapping Programme

Start —Completed 2002-10-10
50
Urban Infrastructure

Bagmati Area Sewerage Project — Updated Master Plan

Client: BASP

Start —Completed 2003-05-07
51
Urban Infrastructure

Feasibility Study of New International Airport at Lumbini

Client: CAAN

Start —Completed 2000-06-10
52
Other Engineering

Higher Education Project, Tribhuvan University

Client: Tribhuvan University

Start —Completed 1997-12-01
53
Environment

Hazard Mitigation in Northern Sun Koshi & Bhote Koshi Catchments

Client: Swiss Government

Start —Completed 1995-07-02
54
Other Engineering

Wool Dye House Construction, Solukhumbu

Client: ITECO, Switzerland

Start —Completed 1987-02-05
55
Other Engineering

Jogimara Majhimtar Limestone Quarry Project, Chitwan

Client: FAO

Start —Completed 1985-10-12
ITECO Nepal (P) Ltd. · Engineering Consulting & Infrastructure Development